14. Checking and Starting Up the Unit
Preparing for first start up
Restarting after shutting down for long periods
The chiller must be started up for the first time by the Technical Service. Before starting up the chillers, make
sure that:
-
All safety conditions have been respected.
-
The chiller is adequately fixed to the surface it rests on.
- Functional
distances have been respected.
-
Hydraulic connections have been carried out as indicated in the manual.
-
The water circuit is filled and vented. When draining after heat pump operation, take care as the water
may be hot.
-
The water circuit valves are open.
- Electrical
connections
have been carried out correctly.
-
Voltage is within a tolerance of 10% of the rated voltage for the unit.
-
The unit is correctly earthed.
-
All electrical and hydraulic connections are tight and have been completed correctly.
- Use grommet A for the electrical power cable and grommet B for the other external wires.
A
B
To complete the electrical connections:
- Remove the inspection panel by unscrewing the five screws. For example,
MGC-V5W/D2N1 model.
43
Summary of Contents for SCV-100EA
Page 1: ...SCV xxEA SERVICE MANUAL AIR COOLED MINI CHILLER UNIT AIR CONDITIONING...
Page 16: ...7 Wiring Diagram SCV 50EA SCV 70EA 14...
Page 17: ...SCV 100EA 15...
Page 18: ...SCV 120EA SCV 140EA SCV 160EA 16...
Page 28: ...11 Water Pressure Drop SCV 50EA SCV 70EA SCV 100EA Heat exchanger pressure drop water side 26...
Page 29: ...SCV 120EA SCV 140EA 27...
Page 30: ...SCV 160EA 28...
Page 88: ...18 Optional Accessories No Name Specification Remark 1 Wired controller KJR 120F Customized 86...
Page 91: ...Exploded view of unit SCV 50EA 22 7 22 6 22 5 22 4 22 2 22 1 22 3 89...
Page 94: ...Exploded view of unit SCV 70EA 22 7 22 6 22 5 22 4 22 2 22 1 22 3 92...
Page 97: ...Exploded view of unit SCV 100EA 25 1 25 2 25 3 25 6 25 7 25 4 25 5 25 9 25 8 95...
Page 100: ...Exploded view of unit SCV 120EA 25 1 25 2 25 3 25 4 25 5 25 6 25 7 25 9 25 8 25 10 25 11 98...
Page 103: ...Exploded view of unit SCV 140EA 25 1 25 2 25 3 25 4 25 5 25 6 25 7 25 9 25 8 25 10 25 11 101...
Page 106: ...Exploded view of unit SCV 160EA 25 1 25 2 25 3 25 4 25 5 25 6 25 7 25 9 25 8 25 10 25 11 104...