Powering On the System
007-4644-001
77
Note:
To speed drive spin-up, it is recommended that you start the expansion enclosures
before or at the same time as the controller enclosure. This procedure powers up all
components in the system at the same time by turning on the power distribution units.
6. Turn on both power switches on the rear of each expansion enclosure. Then turn on
both power switches on the rear of the controller enclosure (see Figure 5-8).
7. When all controller and drive enclosure power switches are in the ON position, flip
the breaker switches of both PDUs to the ON position (see Figure 5-9).
8. Check the indicator lights on the front and rear of each component. If any lights
indicate a fault, see “Checking the Indicator Lights” on page 34.
Summary of Contents for Total Performance 9300
Page 1: ...SGI Total Performance 9300 RAID User s Guide 007 4644 001 ...
Page 3: ...007 4644 001 iii Record of Revision Version Description 001 May 2003 Original publication ...
Page 4: ......
Page 8: ......
Page 12: ......
Page 44: ......
Page 62: ......
Page 96: ......
Page 114: ......
Page 120: ......