Replacing a Failed SFP Transceiver
007-4644-001
53
Figure 4-5
Removing and Installing an SFP Transceiver
Note:
Figure 4-5 shows SFPs being replaced in an expansion enclosure. The procedure is
the same for controller enclosures.
6. Remove the failed SFP transceiver from the environmental status module or RAID
controller.
7. Insert the new SFP transceiver into the environmental status module or RAID
controller.
8. Connect the Fibre Channel cables to the new SFP transceiver.
9. Check the bypass indicator next to the new SFP transceiver as follows (see
Figure 4-5):
•
If the bypass indicator is on, the SFP transceiver might be installed incorrectly.
Remove the SFP transceiver and reinsert it.
•
If the bypass indicator stays on, or a fault indicator on the environmental status
module comes on, use TPSSM to determine the problem.
ESM
Fiber-optic cable
SFP transceiver
Interface
connector
ESM
Summary of Contents for Total Performance 9300
Page 1: ...SGI Total Performance 9300 RAID User s Guide 007 4644 001 ...
Page 3: ...007 4644 001 iii Record of Revision Version Description 001 May 2003 Original publication ...
Page 4: ......
Page 8: ......
Page 12: ......
Page 44: ......
Page 62: ......
Page 96: ......
Page 114: ......
Page 120: ......