3: Operating Storage Enclosures
To turn on the enclosure after a normal shutdown (as described in “Turning the Power
Off” on page 32), turn on both power switches on the rear of the enclosure (see
Figure 3-1) or the main circuit breaker, whichever is applicable. You must turn on both
power supply switches to take advantage of the redundant power supplies.
Note:
Always wait at least 30 seconds between the time you turn a power switch off and
the time you turn it back on again.
Note:
To speed drive spin-up, it is recommended that you start the expansion enclosures
before or at the same time as the controller enclosure.
Figure 3-1
Turning the Power On and Off
Note:
The activity and fault indicators above the drive bays may flash intermittently as
the drives spin up. Wait until the enclosure has finished powering on before checking the
indicator lights on the front of the enclosure. All indicators should be green. If they are
not, use the storage management software (TPSSM) to diagnose the problem.
Power supply switches
Summary of Contents for Total Performance 9300
Page 1: ...SGI Total Performance 9300 RAID User s Guide 007 4644 001 ...
Page 3: ...007 4644 001 iii Record of Revision Version Description 001 May 2003 Original publication ...
Page 4: ......
Page 8: ......
Page 12: ......
Page 44: ......
Page 62: ......
Page 96: ......
Page 114: ......
Page 120: ......