Model 9500 Central Station Receiver Installation/Operation Manual
4-30
151059
4.7.2
PBX Operation
Prior to performing listen-in functions on a PBX phone line system the receiver must be set up
with the proper listen-in mode and PBX string. Refer to Sections 5.2 and 5.5.2.6 to properly
program the receiver to handle PBX listen-in calls.
4.8
Testing the System
Because there are so many variations in dialer parameters and phone line conditions, the only
way to be absolutely certain that all subscribers can communicate with the 9500 is to test
every subscriber's dialer individually. Subscribers must test their communicators every 30
days to make sure the 9500 receives the information.
When you install a new 9500, test every manufacturers' panels for each format. This is
necessary because different manufacturers' panels may operate differently even if all panels
use the same format.
IMPORTANT:
The 9500 should be tested regularly to ensure complete and proper operation.
Reports of automatic signal receipt must be verified daily. All testing, inspection,
and maintenance must be done in accordance with NFPA 72 requirements.
Summary of Contents for 9500
Page 7: ...Model 9500 Central Station Receiver Installation Operation Manual vi 151059 ...
Page 145: ...Model 9500 Central Station Receiver Installation Operation Manual 7 8 151059 ...
Page 155: ...Model 9500 Central Station Receiver Installation Operation Manual A 10 151059 ...
Page 161: ...151059 Index 4 ...