INSTRUCTION MANUAL AquaScat 2
Servicing
52
11778E/1
8.3.
Manual adjustment
WORKSTEP
PROCEDURE
1.
Interrupt the sample supply
to the photometer.
2.
Loosen conduit gland (X)
and remove the inlet tube
(Y).
3.
Remove the optics unit of
the photometer and fasten
onto the docking station.
Section 4.4
4.
Install checking unit.
4.1: Inspect the checking unit to ensure it is clean and
dry.
4.2: Install the checking unit and fasten with the
knurled screws.
Make sure that the pins enter the positioning holes (cir-
cles).