![Siemens TM Timer DIDQ Commissioning Manual Download Page 42](http://html.mh-extra.com/html/siemens/tm-timer-didq/tm-timer-didq_commissioning-manual_1265510042.webp)
3.3.2
Requirements for operation
Preconditions
The following preconditions must be met before operating TM Timer DIDQ technology module.
1. Your system hardware including the technology module is installed and wired.
2. You have physically connected the technology module via an ET 200SP interface module
or an ET 200MP interface module with a SIMOTION controller via the PROFINET IO
interface (see Chapter System integration (Page 17)).
3. You have created a project with a SIMOTION controller with PROFINET interface in the
TIA Portal (sync master) and configured PROFINET IRT. The SIMOTION controller is
configured for isochronous operation.
4. You have inserted an ET 200MP interface module, e.g. IM155-5 PN HF, assigned it to the
SIMOTION controller, and configured it as sync slave with PROFINET IRT. The interface
module is configured for isochronous operation.
Note
If you operating several ET 200SP/ET 200MP interface modules and technology modules
TM Timer DIDQ, you must set the isochronous mode at all of the modules.
5. You have integrated the interface module into the PROFINET topology.
Figure 3-17 Project in the TIA Portal - network view
Configuring
3.3 SIMOTION SCOUT TIA
Technology Modules TM Timer DIDQ for SIMOTION SCOUT and SIMOTION SCOUT TIA
42
Commissioning Manual, 01/2015