3.2.2
Requirements for operation
Preconditions
The following preconditions must be met before operating TM Timer DIDQ technology module.
1. Your system hardware including the technology module is installed and wired.
2. You have physically connected the technology module via an ET 200SP interface module,
version HF or HS, with a SIMOTION controller via the PROFINET IO interface (see Chapter
System integration (Page 17)).
3. You have created a project with a SIMOTION controller with PROFINET interface in
SIMATIC STEP 7 or in SIMOTION SCOUT and configured PROFINET IRT. For
isochronous operation, the following settings must be made at the SIMOTION controller.
Figure 3-1
Isochronous setting at the SIMOTION controller
Note
For further information on configuration of the PROFINET communication please refer to the
SIMOTION SCOUT Communication Manual.
Note
The procedures contained in this section assume that the user has a general understanding
of SIMATIC STEP 7 and SIMOTION SCOUT.
Configuring
3.2 SIMOTION SCOUT
Technology Modules TM Timer DIDQ for SIMOTION SCOUT and SIMOTION SCOUT TIA
Commissioning Manual, 01/2015
23