Functions
5.5 Functions of the inputs
SIRIUS 3RW30 / 3RW40
40
Manual, 01/2010, 535 1995-02 DS01
5.5
Functions of the inputs
5.5.1
Start input (terminal 1) on 3RW30 and 3RW40 2 to 3RW40 4
Rated control voltage is present at terminal A1 / A2: The startup process of the soft starter
begins when a signal is present at terminal 1 (IN). The starter operates until the signal is
removed again.
If a ramp-down time is parameterized (3RW40 only), a soft stop starts as soon as the signal is
removed.
The potential of the signal at terminal 1 must correspond to the potential of the rated control
voltage at terminal A1 / A2.
For recommended circuits, e.g. control by means of pushbuttons, contactor contacts, or a
PLC, refer to chapter Typical circuit diagrams [Page 167].
5.5.2
Start input (terminal 3) on 3RW40 5 and 3RW40 7
Rated control voltage is present at terminal A1 / A2: The startup process of the soft starter
begins when a signal is present at terminal 3 (IN). The starter operates until the signal is
removed again. If a ramp-down time is parameterized, a soft stop starts as soon as the signal
is removed.
The 24 V DC control voltage supplied by the soft starter must be taken from terminal 1 (+) as
voltage for the signal at terminal 3.
If you select direct control by a PLC, the "M" of the PLC's reference potential must be
connected to terminal 2 (-).
For recommended circuits, e.g. control by means of pushbuttons, contactor contacts, or a
PLC, refer to chapter Typical circuit diagrams [Page 167].
$
$
9
GFFG ,1
+]
9
Summary of Contents for SIRIUS 3RW40
Page 1: ...Soft starters SIRIUS 3RW30 3RW40 Manual 01 2010 Industrial Controls Answers for industry ...
Page 2: ......
Page 68: ...Connecting 9 1 Electrical connection SIRIUS 3RW30 3RW40 68 Manual 01 2010 535 1995 02 DS01 ...
Page 210: ...Index SIRIUS 3RW30 3RW40 210 Manual 01 2010 535 1995 02 DS01 ...
Page 211: ......