Installation and mounting
5.6 Connecting the charging station
SICHARGE D
Operating Instructions, 02/2021, 8EM5907-0AA00-1AA7.01
67
Requirements
•
You have removed the protective cover in front of the connections of N, L1, L2 and L3.
•
You have inserted all cables on the supply side into the cabinet and installed the cable
gland plate again.
Connections for the power supply cable
①
Connection for N
②
Connection for L1
③
Connection for L2
④
Connection for L3
⑤
Connection for PE
Figure 5-10 Connections of the power supply cable