Commissioning
6
6.1
Safety precautions before initial commissioning
Before initial commissioning, check the charging station in accordance with DIN VDE 0100-
600. This includes, in particular, measuring the impedance of the protective conductor and
the insulation resistances. Also check the fuse protection of the charging station on the mains
side.
6.2
Switch on charging station
WARNING
Qualified personnel
Only qualified and instructed electricians may work on the SICHARGE D.
WARNING
Injury or damage to property
If the charging plug is not plugged into the plug holder before commissioning, the charging
plug can be damaged. This can cause injury or damage to property when the charging
station is switched on.
•
Before switching on the charging station, make sure that the charging plug is in the plug
holder.
•
Leave the charging plug in the plug holder during the entire switch-on process.
DANGER
Risk of electric shock when moist due to condensed water
Before putting the charging station into operation, an authorized and qualified electrician
must check whether there is any moisture in the charging station. Manually remove even
small amounts of condensation before commissioning. Take appropriate measures for
drying.
Do not switch off the power supply for an extended period of time after commissioning.
This will prevent condensation in the charging station.