11.8.4
Outputting the symbol of the request on the report
Procedure
If you want to output the symbol of the P&ID object on the P&ID following pipe spec mapping,
you must delete the symbol script for the corresponding drawing type at the pipe part catalog
object.
P&ID 3D pipe part catalog interaction
11.8 Configuring pipe part catalog base objects
PipeSpec Designer
Operating Manual, 09/2014, A5E32076948-AA
131
Summary of Contents for COMOS
Page 8: ...Table of contents PipeSpec Designer 8 Operating Manual 09 2014 A5E32076948 AA ...
Page 10: ...Publisher PipeSpec Designer 10 Operating Manual 09 2014 A5E32076948 AA ...
Page 70: ...Calling the PipeSpec Designer PipeSpec Designer 70 Operating Manual 09 2014 A5E32076948 AA ...
Page 118: ...Documenting pipe specs PipeSpec Designer 118 Operating Manual 09 2014 A5E32076948 AA ...