![SICK ZIRKOR Series Operating Instructions Manual Download Page 63](http://html.mh-extra.com/html/sick/zirkor-series/zirkor-series_operating-instructions-manual_1264209063.webp)
63
8024252/AE00/V1-0/2020-07| SICK
O P E R A T I N G I N S T R U C T I O N S | ZIRKOR200 Ex-D
Subject to change without notice
MAINTENANCE
8
8.6.8
Replacing the O
2
measuring cell
Fig. 37: O
2
-Replacing the measuring cell
▸
Switch off the electronics, remove the measuring probe from the protection tube and let
the probe cool down.
▸
To replace the O
2
measuring cell, first remove the inner part of the probe (6) (
).
▸
Then unscrew filter head (1) and remove test gas distributor (2) by loosening the two
hexagon socket screws.
▸
Now loosen the 4 hexagon socket screws on measuring cell flange (3b) and remove
measuring cell (3) from measuring probe tube (4). Also carefully remove the old
measuring cell flange seal (3a).
▸
Clean the flange on the measuring probe tube with fine sandpaper.
▸
When assembling, the volume reducer must be installed so that the product is Ex-
compliant.
▸
Screw the new measuring cell to the measuring cell flange of the probe tube with a new
gasket and 4 new screws.
Note:
It is only necessary to replace the measuring cell if it leaks (jumping or incorrect
measured values) and a two-point adjustment was faulty.
WARNING: Risk of burns
The temperature of the probe filter head and all parts in the process gas is 150 °C to
800 °C (302 °F to 1472 °F) during operation. Directly touching the parts for
disassembly or maintenance causes serious burns!
▸
Use heat protection gloves when removing the probe.
▸
Switch the electronics supply voltage off before removing the probe.
▸
Place the probe in a safe, protected area after removal and wait until the probe
temperature has cooled down to the ambient temperature.
1
Filter head
3b
Measuring cell flange
2
Test gas distributor
4
Measuring probe tube
3
Measuring cell
5
Connection unit
3a
Measuring cell flange seal
6
Probe inner part