COMMISSIONING
6.2
Initial commissioning
Switch on the supply voltage. After switching the device on, the startup screen which also
contains the software version is displayed briefly. Afterwards, you will be prompted to select
the language, set the system date and time, assign a TAG number and select a SICK
REMOTE code (only if SICK REMOTE is activated at the factory).
The probe heating phase begins and then measuring mode starts.
Fig. 22: Initial commissioning. The software version is displayed in the lower right corner.
6.3
Display - heating process
Fig. 23: Display - heating process
6.4
Display - Measuring mode
Fig. 24: Display - Measuring mode
* Only when O
2
limit value alarms are switched on and the defined limit values are within the
measuring range.
The heating process starts with heating up the
O
2
sensor.
1
TAG No.
2
Temperature, analog display
3
Last access, with date
Rising probe temperature
4
(or) shows waiting time
(or) heating fault
5
Current temperature
6
Softkey: System menu
.
1
TAG No.
2
Measured value
3
Measuring range specification
4
Flashing arrow - indicators show measuring
range underflow or overflow
5
Last access, with date
6
Measuring component
7
Analog display shows measured value and
range indicator - min-alarm / max-alarm *
8
Softkey name