![SICK ZIRKOR Series Operating Instructions Manual Download Page 27](http://html.mh-extra.com/html/sick/zirkor-series/zirkor-series_operating-instructions-manual_1264209027.webp)
27
8024252/AE00/V1-0/2020-07| SICK
O P E R A T I N G I N S T R U C T I O N S | ZIRKOR200 Ex-D
Subject to change without notice
INSTALLATION
5
Fig. 8: Installing and insulating the measuring probe
5.9.4
Installing the measuring probe
Flue gas temperature, pressure and all other process conditions must be within the
specification limits of the ZIRKOR200 Ex-D. It is necessary to leave sufficient assembly
space for the probe and protection tube. Access to the measuring probe or the connection
unit must be ensured. Before breaking through the flue gas duct wall, make sure there is
enough space inside and outside the duct for installation, that there are no fixtures in the
vicinity and no other obstacles in the way.
1
Gas-tight welded adapter plate
2
Probe protection tube
2a
Protection tube seal
3
Nuts, washers and lock washers
4
Measuring probe
4a
Measuring probe flange seal
5
Filter head
6
Measuring probe flange
1
2
2a
5
4a
3
6
4