![SICK ZIRKOR Series Operating Instructions Manual Download Page 22](http://html.mh-extra.com/html/sick/zirkor-series/zirkor-series_operating-instructions-manual_1264209022.webp)
22
8024252/AE00/V1-0/2020-07| SICK
O P E R A T I N G I N S T R U C T I O N S | ZIRKOR200 Ex-D
Subject to change without notice
5
INSTALLATION
5
Installation
5.1
Determination of the requirements for explosion protection
Check with the marking of the device and its components whether all requirements
regarding zone classification, temperature class, gas group, safety level, ambient
temperatures and pressure conditions are met.
5.2
Information on installation in potentially explosive atmospheres
Correct installation
DANGER: Danger of explosion during installation work
There is a danger of explosion due to sparking during installation, for example when
cables are connected or components are dropped.
▸
Perform installation work only in the Ex-free area.
DANGER: Danger of explosion through incorrect installation work
Incorrect assessment of the installation location as well as all further installation work
in potentially explosive atmospheres can cause serious injuries to people and damage
during operation.
▸
Installation, commissioning, maintenance and testing may be performed only by
skilled persons who have knowledge of the rules and regulations for potentially explo-
sive atmospheres, particularly:
– Ignition protection types
– Installation rules
– Zone classification
▸
Standards to be applied
▸
Local work safety regulations
DANGER: Danger of explosion due to damaged probe tube
A cold probe can be damaged by condensed, corrosive flue gas, as a result of which the
probe is no longer encapsulated in a flameproof enclosure and can lead to explosions.
▸
The probe must be in operation while in the process.
CAUTION: Risk of injury when the device drops down
The device is heavy and may cause injury if dropped.
▸
Carry out assembly work on the device in pairs.