![SICK ZIRKOR Series Operating Instructions Manual Download Page 11](http://html.mh-extra.com/html/sick/zirkor-series/zirkor-series_operating-instructions-manual_1264209011.webp)
11
8024252/AE00/V1-0/2020-07| SICK
O P E R A T I N G I N S T R U C T I O N S | ZIRKOR200 Ex-D
Subject to change without notice
FOR YOUR SAFETY
2
Potential equalization
2.2
Warning information on device
On the probe enclosure:
Fig. 1: Warning information on probe enclosure
●
Do not open under voltage and when the incinerator is in operation. Observe the waiting
time for all probe components to cool down to 133 °C (min. 1 hour).
●
Follow the instructions in the Manual.
2.3
Intended use
2.3.1
Purpose of the device
The device is a stationary oxygen measuring device and serves continuous measurement
of oxygen as emission and process monitoring in the industrial sector. The device
measures continuously directly in the gas duct (in-situ).
2.3.2
Operation in potentially explosive atmospheres
●
The ZIRKOR200 Ex-D measuring probe corresponds to the ATEX category (according to
ATEX 2014/34/EU):
II 2D Ex tb IIIC T133 °C/T141 °C Db
●
The ZIRKOR200 Ex-D measuring probe fulfills the following IECEx qualification:
Ex tb IIIC T133 °C/T141 °C Db
CAUTION:
Danger of explosion through incorrect or missing grounding
Incorrectly connected potential equalization can generate charges that can lead to
explosions in an Ex-atmosphere.
▸
Connect potential equalization to all points provided on the device components.
▸
Ensure the potential equalization is connected during all work on the device
described in these Operating Instructions.
▸
Ensure there is a ground connection via the power supply.
▸
Regularly check the grounding connections for correctness.
Warning