10.5.6
Check measured values (when system in operation)...........
10.6 Maintaining the instrument air conditioning..........................................
10.6.1
Maintaining the instrument air conditioning (option)............ 45
10.6.2
Maintaining the external instrument air conditioning
(option).....................................................................................
10.7 Replacing the Electronics module filter pad...........................................
11
Troubleshooting................................................................................. 47
11.2 Important information..............................................................................
11.3 Error messages and possible causes.....................................................
12
Decommissioning............................................................................. 52
12.1.1
Switching off.............................................................................
12.1.2
Shutdown.................................................................................
12.2.1
Shipping for repair...................................................................
12.2.2
Cleaning the device before returning.....................................
12.3 Transport...................................................................................................
13
Technical data.................................................................................... 54
13.1 Dimensional drawings..............................................................................
13.2 Technical data...........................................................................................
13.2.1
Measured values.....................................................................
13.2.2
Ambient conditions..................................................................
13.2.3
Housing....................................................................................
13.2.4
Interfaces and protocols.........................................................
13.2.5
Power supply............................................................................
13.2.6
Gas supply................................................................................
13.2.7
Tube connections.....................................................................
13.2.8
Sample gas conditions............................................................
13.2.9
Connections in analyzer..........................................................
13.2.9.1 Power supply - connection / fuses........................
13.2.9.2 Electronics fuses..................................................... 59
13.2.9.3 Connections for heated components....................
13.2.9.4 Connections for interfaces and SD card...............
13.2.10 Heated sample gas line (option).............................................
13.2.11 Switching on the circuit breakers again.................................
13.2.12 Torques for screw fittings........................................................
14
14.2.1
Liability disclaimer...................................................................
14.2.2
Software licences....................................................................
CONTENTS
8026608/AE00/V1-0/2021-10 | SICK
O P E R A T I N G I N S T R U C T I O N S | MCS200HW-MP
5
Subject to change without notice