ASSEMBLY AND INSTALLATION
Work to be performed
▸
Measure the fitting location and mark the assembly location and provide sufficient
clearance to fit and remove the sender/receiver unit.
Fig. 15: Clearance for the sender/receiver unit
▸
Remove insulation (when fitted)
▸
Cut suitable openings in the duct wall; bore large enough holes in brick or concrete
stacks (flange tube diameter).
▸
Insert the flange with tube in the opening slanting slightly downwards (1 to 3°) so that
the “Top” marking points upwards and any condensate that may collect in the duct can
drain off.
▸
Weld the flange with tube on using an anchor plate for brick or concrete stacks, insert
junction plates for thin-walled ducts.
▸
Close off the flange opening after fitting to prevent gas escaping.
TOP
NL + 400 400 400
Clearance
Flange with tube
Duct wall
NOTE:
!
▸
Do not let separated pieces fall into the duct.