
4.1
Transport...................................................................................................
4.2
Unpacking.................................................................................................. 23
4.3
4.4
5
Mounting............................................................................................. 24
5.1
5.2
5.3
Mounting the device.................................................................................
6
Electrical installation........................................................................ 26
6.1
Wiring instructions....................................................................................
6.2
Connecting the device electrically...........................................................
6.3
Connection diagram.................................................................................
7
Commissioning and configuration.................................................. 27
7.1
Installation of SOPAS Engineering Tool...................................................
7.1.1
Installation process.................................................................
7.1.2
Installing the device driver......................................................
7.2
Parameterization of the device................................................................
7.2.1
Establishing the connection....................................................
7.2.2
Configure the device................................................................
7.2.3
Changing parameters..............................................................
7.3
Configuring the functions.........................................................................
7.3.1
Identification............................................................................
7.3.2
Main Settings & Visualization.................................................
7.3.3
Outputs Settings......................................................................
7.3.4
Advanced settings...................................................................
7.3.5
Device information...................................................................
7.3.6
Preventing unintended or unauthorized modification...........
7.4
7.4.1
Process data............................................................................
7.4.2
Safety-related use of the IO-Link interface............................
8
Error behavior..................................................................................... 46
8.1
8.2
Internally detected errors.........................................................................
8.3
Internally undetected errors and faults...................................................
8.4
Environmental influences........................................................................
8.5
8.6
9
Project planning................................................................................ 48
9.1
Placing the machine on the market (system integrator)........................
9.2
Operating entity of the machine..............................................................
9.3
Preventing unprotected areas..................................................................
9.4
Response time of the device.................................................................... 49
CONTENTS
4
O P E R A T I N G I N S T R U C T I O N S | DT35S
8027663//2022-08-04 | SICK
Subject to change without notice