1
Table of contents
1. Safety Instructions ······························································ 2
2. Specifications ····································································· 8
2-1. Specifications ································································· 8
2-2. Ambient Conditions ·························································· 9
3. Applications ······································································· 9
4. Part Names ········································································ 9
5. Equipment ········································································ 12
5-1. Spill Containment ··························································· 12
5-2. Multi digital meter ··························································· 12
5-3. Error Code Display ························································· 13
5-4. Monitor Lamp ································································ 13
5-5. Earth Leakage Circuit Breaker and Grounding ····················· 15
5-6. Emergency Stop Switch ··················································· 18
5-7. Terminal Cover Switch ····················································· 18
6. Transport/Installation ························································· 18
6-1. Transport Procedures ······················································ 18
6-2. Installation Procedures ···················································· 19
7. Load Connections ······························································ 20
7-1. Load Cable Selection ······················································ 20
7-2. Connecting Load Cables·················································· 21
8. Pre-Operation Inspection ···················································· 24
8-1. Checking Engine Oil ······················································· 25
8-2. Checking Coolant ··························································· 25
8-3. Checking the Fuel ·························································· 26
8-4. Checking the Spill Containment ········································· 27
8-5. Checking for Fuel/Oil/ Coolant Leak ··································· 27
8-6. Checking the Battery ······················································· 28
Operating Procedures ························································ 29
9-1. Initial startup / Pre-check ················································· 30
9-2. Stopping the Engine ························································ 32
9-3. Emergency Stop ···························································· 32
9-4. Protective Functions ······················································· 32
10. Inspection/Maintenance ···················································· 34
Long-Term Storage ··························································· 40
Troubleshooting ······························································ 41
Engine Wiring Diagram ····················································· 43
Generator Wiring Diagram················································· 44
Summary of Contents for DG15BMK
Page 2: ......
Page 11: ...6 LABEL REPRODUCTION X564 000640 X564 000620 X505 000240 X505 006420 X505 006410...
Page 12: ...7 M707 000260 X564 000630 X564 000610 X505 004890 X505 006430 X564 000650...
Page 48: ...43 13 Engine Wiring Diagram...
Page 49: ...44 14 Generator Wiring Diagram...
Page 50: ......
Page 51: ......