4-19
VL-E610S/VL-E610H
VL-E660S/VL-E96E
VL-E98E
(7) Drum ass’y
Install the drum ass’y on the main chassis, and tighten the screws (3 pcs.).
(8) Tape guide
Align the positioning pin, and tighten the screw (one pc.).
4-5-5. Phase matching
The phase of the following parts must be matched as shown in the figure below.
(Ascertain that the marks and round holes align.)
(1) Lo relay gear (2) Main cam (3) Sub-cam (4) Mode switch
Lo relay gear
Phase
alignment mark
(Round hole)
Phase alignment mark
( Mark)
Phase alignment mark
(Round hole)
Mode switch
a
B
T arm guide Segment gear
M-function lever
Move claw
to rear side.
Move claw to
rear side.
Item
Tightening torque
Quantity
a S Tight M1.4 x 3
70mN·m (0.7kgf·cm)
1
B ø0.8-ø3.0-t0.2
1
4-6. MECHANISM ASSEMBLING METHOD
(1) Adjust the phase of each part.
(2) Install screws and washers.
(3) Install the segment gear, T arm guide and the M-function lever. Install the eject lever.