Instruction manual
24
4.6.2. INSTALLATION TESTING
Prior to initial
firing
it is necessary to check if the boiler and the entire
heating system are filled with water and well deaerated. Also check if the
smoke uptake pipe is properly fastened.
After initiation
make sure:
there is no leakage of any kind,
that the entire installation is deaerated,
that the water temperature in the boiler is increasing,
that boiler operations do not result in condensation (“sweating”)
in the chimney.
Repeat the entire inspection after several days of constant feeding !
Also, PRIOR TO INSTALLATION
activate the safety valve and check its
proper functionality
.
4.6.3. RECEIVING AND MAINTAINING THE INSTALLATION
When receiving the installation, inspect the installation in its entirety with
the contractor.
The contractor is obligated to provide basic information
about the installation operations and indicate the position and
function of the installation key components
. Also, the contractor is
obligated to complete the installation report which can be found at the end
of this
Manual
!
Deaerate the entire heating system after several days and refill it with
water if necessary.
Inspection of installation working performance is to be executed at
least once a year
by an authorized maintenance technician. This will
ensure safe working performance of the boiler, as well as economic and
immaculate heating.
In case of installation faulty operation, contact your central heating
installation contractor exclusively !