ASSEMBL
Y
AND INST
ALLA
TION
CONFIRMATION OF ASSEMBLY
Use test mode to confirm that assembly is proper, and that the LINDBERGH, connecting boards, and input/output
devices are normal.
Perform the following tests in test mode.
For tests (1) to (4), refer to the LINDBERGH service manual. For tests (5) to (7), see [9-3 Game Test Mode].
The items displayed on the test screen for tests (5) and (6) vary depending on the setting for cabinet type in the game
setting screen.
(1) Information Display Screen
When “SYSTEM INFORMATION,” “STORAGE INFORMATION,” or “JVS TEST” has been selected on the
system test mode menu, system information, game information and information on JVS I/O board connected to
LINDBERGH are displayed.
If each category of information is displayed without anomalies, the LINDBERGH is normal.
(2) JVS Input Test Screen
When “INPUT TEST” has been selected on the JVS test screen, data input to the JVS I/O board is displayed. On the
product, this is the screen for the testing coin switch.
Insert a coin. If the display to the side of the switch changes the switch and wiring connections are normal.
(3) Monitor Test Screen
When “MONITOR TEST” has been selected on the system test mode menu, the screen for checking monitor
adjustment status appears.
Monitor adjustment is completed when the product is shipped from the factory, but you should observe the test
screen to determine whether further adjustment is necessary. Refer to Chapter 10 and adjust the monitor if necessary.
(4) Speaker Test Screen
When “SPEAKER TEST” has been selected on the system test mode menu, the screen for checking speaker sound
output appears.
To confirm that audio output is normal, have test sound output from the game unit’s speaker.
(5) Input Test
When “INPUT TEST” has been selected on the game test mode menu, the screen for testing input device appears.
Test operate the input device by pressing each switch. If the display on the side of each input device changes to
“ON” and numerical values change smoothly in accordance with each operation, the input device and its wiring
connections are normal.
FIG. 6-7a Input Test Screen
Summary of Contents for AFTER BURNER CLIMAX
Page 12: ...1 HANDLING PRECAUTIONS FIG 1b FIG 1c FIG 1d...
Page 50: ...7 PRECAUTIONS WHEN MOVING THE MACHINE 42 FIG 7 1b...
Page 58: ...8 GAME DESCRIPTION 50 FIG 8b FIG 8c...
Page 80: ...EXPLANATION OF TEST AND DATA DISPLAY FIG 9 3a03...
Page 83: ...EXPLANATION OF TEST AND DATA DISPLAY 9 75 FIG 9 3b03...
Page 151: ...TROUBLESHOOTING 17 143 3 Remove the front door FIG 17 3b 4 Replace fuse inside base FIG 17 3c...
Page 176: ...22 PARTS LIST 168 PARTS LIST 22...
Page 181: ...PARTS LIST 22 173 2 ASSY ROLLING BASE ABX 1000 D 1 3 Fastening Torque...
Page 190: ...22 PARTS LIST 182 8 MOTOR UNIT ABX 3200 D 1 2 Fastening Torque...
Page 205: ...PARTS LIST 22 197 22 ASSY MONITOR BOX ABX 1100 D 1 2 Opposite side...
Page 209: ...PARTS LIST 22 201 25 ASSY COINCHUTE TOWER ABX 1200 D 1 2 Coin Box Part...
Page 216: ......
Page 217: ...PARTS LIST 22 209 32 ASSY BILLBOARD ABX 1500 D 1 2...
Page 223: ...PARTS LIST 22 215 36 THROTTLE UNIT ABX W O GRIP 610 0758 D 1 2...
Page 225: ...PARTS LIST 22 217 37 ASSY SEAT UPPER ABX 1700 D 1 2...
Page 233: ...225 WIRING DIAGRAM 24 WIRING DIAGRAM D 1 2 24...
Page 234: ...226 WIRING DIAGRAM 24 D 2 2...