ASSEMBL
Y
AND INST
ALLA
TION
1
Installation and assembly of this product should take place in the following sequence.
1
FIXATION TO INSTALLATION SITE
2
ATTACHMENT OF BILLBOARD
3
PREPARATION FOR INSTALLATION
4
CONNECTION OF POWER AND GROUND
5
ENGAGEMENT OF POWER SUPPLY AND SOFTWARE INSTALLATION
6
ENGAGEMENT OF POWER SUPPLY AFTER INSTALLING SOFTWARE
7
CONFIRMATION OF ASSEMBLY
Essential tools
- Philips screwdriver (for M4 screws)
- 24 mm spanner
24 mm
- 7 & 10 mm socket wrenches
(for M4, M6 hexagonal bolts, nuts)
- Master key (accessory)
- Flashlight or other supplementary lighting
Summary of Contents for AFTER BURNER CLIMAX
Page 12: ...1 HANDLING PRECAUTIONS FIG 1b FIG 1c FIG 1d...
Page 50: ...7 PRECAUTIONS WHEN MOVING THE MACHINE 42 FIG 7 1b...
Page 58: ...8 GAME DESCRIPTION 50 FIG 8b FIG 8c...
Page 80: ...EXPLANATION OF TEST AND DATA DISPLAY FIG 9 3a03...
Page 83: ...EXPLANATION OF TEST AND DATA DISPLAY 9 75 FIG 9 3b03...
Page 151: ...TROUBLESHOOTING 17 143 3 Remove the front door FIG 17 3b 4 Replace fuse inside base FIG 17 3c...
Page 176: ...22 PARTS LIST 168 PARTS LIST 22...
Page 181: ...PARTS LIST 22 173 2 ASSY ROLLING BASE ABX 1000 D 1 3 Fastening Torque...
Page 190: ...22 PARTS LIST 182 8 MOTOR UNIT ABX 3200 D 1 2 Fastening Torque...
Page 205: ...PARTS LIST 22 197 22 ASSY MONITOR BOX ABX 1100 D 1 2 Opposite side...
Page 209: ...PARTS LIST 22 201 25 ASSY COINCHUTE TOWER ABX 1200 D 1 2 Coin Box Part...
Page 216: ......
Page 217: ...PARTS LIST 22 209 32 ASSY BILLBOARD ABX 1500 D 1 2...
Page 223: ...PARTS LIST 22 215 36 THROTTLE UNIT ABX W O GRIP 610 0758 D 1 2...
Page 225: ...PARTS LIST 22 217 37 ASSY SEAT UPPER ABX 1700 D 1 2...
Page 233: ...225 WIRING DIAGRAM 24 WIRING DIAGRAM D 1 2 24...
Page 234: ...226 WIRING DIAGRAM 24 D 2 2...