CONTROL
STICK
11
10
10
Heat with industrial dryer and affix thermal contraction tube so that it covers soldered area.
FIG. 11-3h
11
Attach the volume to the volume bracket, then attach this assembly to the control stick. Align the D-cut
surface of the volume shaft with the D-cut surface of the hole on the side of the control stick, then insert the
shaft.
FIG. 11-3i
1
Fasten volume bracket with 2 screws.
1
Attach control stick.
1
Engage the power. Note that initialization takes place.
1
Establish volume setting on the game test mode calibration screen. (See 9-3e).
1
Simply changing settings on the calibration screen will not be effective. Terminate the test mode. Note that
initialization takes place upon termination of the test mode.
Summary of Contents for AFTER BURNER CLIMAX
Page 12: ...1 HANDLING PRECAUTIONS FIG 1b FIG 1c FIG 1d...
Page 50: ...7 PRECAUTIONS WHEN MOVING THE MACHINE 42 FIG 7 1b...
Page 58: ...8 GAME DESCRIPTION 50 FIG 8b FIG 8c...
Page 80: ...EXPLANATION OF TEST AND DATA DISPLAY FIG 9 3a03...
Page 83: ...EXPLANATION OF TEST AND DATA DISPLAY 9 75 FIG 9 3b03...
Page 151: ...TROUBLESHOOTING 17 143 3 Remove the front door FIG 17 3b 4 Replace fuse inside base FIG 17 3c...
Page 176: ...22 PARTS LIST 168 PARTS LIST 22...
Page 181: ...PARTS LIST 22 173 2 ASSY ROLLING BASE ABX 1000 D 1 3 Fastening Torque...
Page 190: ...22 PARTS LIST 182 8 MOTOR UNIT ABX 3200 D 1 2 Fastening Torque...
Page 205: ...PARTS LIST 22 197 22 ASSY MONITOR BOX ABX 1100 D 1 2 Opposite side...
Page 209: ...PARTS LIST 22 201 25 ASSY COINCHUTE TOWER ABX 1200 D 1 2 Coin Box Part...
Page 216: ......
Page 217: ...PARTS LIST 22 209 32 ASSY BILLBOARD ABX 1500 D 1 2...
Page 223: ...PARTS LIST 22 215 36 THROTTLE UNIT ABX W O GRIP 610 0758 D 1 2...
Page 225: ...PARTS LIST 22 217 37 ASSY SEAT UPPER ABX 1700 D 1 2...
Page 233: ...225 WIRING DIAGRAM 24 WIRING DIAGRAM D 1 2 24...
Page 234: ...226 WIRING DIAGRAM 24 D 2 2...