66
CRACK PRO® HEATED HOSE MACHINE
OPERATING INSTRUCTIONS – DOUBLE PUMPER
OPTIONAL
TEMPERATURE CONTROL
After starting the engine:
1.
Turn
on
the burner with power
on-off
switch located on the front
of the digital temperature controller. The digital controllers
monitor the heat transfer oil temperature, and the material
temperature, along with the heated hoses.
2.
Turn
on
the
hose enable/disable switch(s)
. The controller will
cycle the burner off and on as the temperature of the heat
transfer oil increases and decreases. The heat from the transfer oil
will be absorbed by the material in the tank.
3.
Once interlock lights turn
on
, then turn
on
the manual agitator
control valve.
TRANSFER OIL
TEMP. SET
BURNER CONTROL
SWITCH
HEATED HOSE
TEMP. SET
MATERIAL
TEMP. SET
HOSE ENABLE/DISABLE
SWITCH
INTERLOCK LOCK
LIGHTS
Summary of Contents for CRACK PRO 125
Page 1: ......
Page 9: ...9 SAFETY PRECAUTIONS AND CAUTIONS FIRST AID ...
Page 22: ...22 ...
Page 23: ...23 ...
Page 24: ...24 ...
Page 25: ...25 ...
Page 26: ...26 ...
Page 27: ...27 ...
Page 28: ...28 ...
Page 29: ...29 ...
Page 40: ...40 HEATED HOSE MAIN CONNECTOR J1 AND HEATED HOSE J2 ...
Page 62: ...62 CRACK PRO HEATED HOSE MACHINE MACHINE PICTURES AND PARTS LIST ROPER 2 PUMP PUMP DIAGRAM ...
Page 69: ...69 HEATED HOSE MAIN CONNECTOR J1 AND HEATED HOSE J2 TIMES 2 CP 260 DOUBLE PUMPER OPTIONAL ...