![SealMaster CRACK PRO 125 Owner'S Manual Download Page 36](http://html.mh-extra.com/html/sealmaster/crack-pro-125/crack-pro-125_owners-manual_1227839036.webp)
36
CRACK PRO® HEATED HOSE MACHINE
OPERATING INSTRUCTIONS
STARTUP
SETTING TEMPERATURE CONTROL
The top scale is the
ambient temperature
of the heat transfer oil.
The bottom scale is the
set temperature
that you want the oil to
be heated to.
The burner shuts off when your setting is exceeded by 10°.
It comes back on when the oil drops to 10° under your setting.
The sequence for setting
475°
temperature is:
1)
Press the left arrow 4 times, then up or down for the
4
.
2)
Press the left arrow again, then up or down for the
7
.
3)
Press the left arrow again, then up or down for the
5
.
4)
Press SET.
ARROW
SETTINGS
BOTTOM SCALE
SET
TOP SCALE
Summary of Contents for CRACK PRO 125
Page 1: ......
Page 9: ...9 SAFETY PRECAUTIONS AND CAUTIONS FIRST AID ...
Page 22: ...22 ...
Page 23: ...23 ...
Page 24: ...24 ...
Page 25: ...25 ...
Page 26: ...26 ...
Page 27: ...27 ...
Page 28: ...28 ...
Page 29: ...29 ...
Page 40: ...40 HEATED HOSE MAIN CONNECTOR J1 AND HEATED HOSE J2 ...
Page 62: ...62 CRACK PRO HEATED HOSE MACHINE MACHINE PICTURES AND PARTS LIST ROPER 2 PUMP PUMP DIAGRAM ...
Page 69: ...69 HEATED HOSE MAIN CONNECTOR J1 AND HEATED HOSE J2 TIMES 2 CP 260 DOUBLE PUMPER OPTIONAL ...