37
CRACK PRO® HEATED HOSE MACHINE
OPERATING INSTRUCTIONS - DIESEL FUEL BURNER
POURING MATERIAL
18.
Set pour pot or applicator under the material discharge
valve #30 and raise the handle to open.
CAUTION: ALWAYS WEAR LONG SLEEVE SHIRT, GLOVES, AND
A FACE SHIELD WHEN PERFORMING THIS OPERATION!
19.
Fill the crack filler pour pot to the desired level and pour into
cracks. Follow with a V-shaped squeegee if desired.
20.
To stop for the day, perform the following steps:
Put the a/c power switch to the
off
position.
Turn the pump switch to reverse for 30 seconds, then
turn to the
off
position.
Leave the agitator switch on the forward position.
Turn the burner control switch to the
off
position.
Shut off the engine.
PUMP SWITCH
BURNER CONTROL
SWITCH
AGITATOR SWITCH
A/C POWER
SWITCH
Summary of Contents for CRACK PRO 125
Page 1: ......
Page 9: ...9 SAFETY PRECAUTIONS AND CAUTIONS FIRST AID ...
Page 22: ...22 ...
Page 23: ...23 ...
Page 24: ...24 ...
Page 25: ...25 ...
Page 26: ...26 ...
Page 27: ...27 ...
Page 28: ...28 ...
Page 29: ...29 ...
Page 40: ...40 HEATED HOSE MAIN CONNECTOR J1 AND HEATED HOSE J2 ...
Page 62: ...62 CRACK PRO HEATED HOSE MACHINE MACHINE PICTURES AND PARTS LIST ROPER 2 PUMP PUMP DIAGRAM ...
Page 69: ...69 HEATED HOSE MAIN CONNECTOR J1 AND HEATED HOSE J2 TIMES 2 CP 260 DOUBLE PUMPER OPTIONAL ...