![SealMaster CRACK PRO 125 Owner'S Manual Download Page 33](http://html.mh-extra.com/html/sealmaster/crack-pro-125/crack-pro-125_owners-manual_1227839033.webp)
33
CRACK PRO® HEATED HOSE MACHINE
APPLIES TO ALL DIESEL FUEL BURNER
OPERATING INSTRUCTIONS - DIESEL FUEL BURNER
ADDING MATERIAL
3.
Open the material tank lid and place inside three boxes of
material. For first time use or an empty tank, lay as many blocks
as possible on the tank floor. Put the blocks in with the widest
part touching the floor. This promotes faster melt times. Close the
lid.
MATERIAL TEMPERATURE
4.
On the top rear curbside corner are two thermometers. One is for
the heat transfer oil on the right and the other is for the material
tank on the left. Both thermometers will correspond with the
digital readouts on the control box.
5.
NOTE: When there are a few inches of liquid material in the tank,
you can add more blocks if desired.
6.
When constantly adding blocks of material, the digital
temperature should be set about 50° higher than the material
pouring temperature.
7.
If the material temperature starts to climb over the
recommended pouring temperature, open the lid and add more
blocks. Leaving the lid open will also help drop the temperature,
or lower the temperature setting on the oil controller.
Summary of Contents for CRACK PRO 125
Page 1: ......
Page 9: ...9 SAFETY PRECAUTIONS AND CAUTIONS FIRST AID ...
Page 22: ...22 ...
Page 23: ...23 ...
Page 24: ...24 ...
Page 25: ...25 ...
Page 26: ...26 ...
Page 27: ...27 ...
Page 28: ...28 ...
Page 29: ...29 ...
Page 40: ...40 HEATED HOSE MAIN CONNECTOR J1 AND HEATED HOSE J2 ...
Page 62: ...62 CRACK PRO HEATED HOSE MACHINE MACHINE PICTURES AND PARTS LIST ROPER 2 PUMP PUMP DIAGRAM ...
Page 69: ...69 HEATED HOSE MAIN CONNECTOR J1 AND HEATED HOSE J2 TIMES 2 CP 260 DOUBLE PUMPER OPTIONAL ...