![SealMaster CRACK PRO 125 Owner'S Manual Download Page 30](http://html.mh-extra.com/html/sealmaster/crack-pro-125/crack-pro-125_owners-manual_1227839030.webp)
30
CRACK PRO® HEATED HOSE MACHINE
OPERATING INSTRUCTIONS - DIESEL FUEL BURNER
STARTUP
CHECK LIST
1.
Check engine oil level. Follow manufacturers’ guidelines as to
type and frequency of changes.
2.
Check hydraulic oil level. Use grade AW68 hydraulic oil.
3.
Check heat transfer oil level with oil dipstick #25. Use a good
quality grade 68 turbine oil or heat transfer oil.
The heat
transfer oil level must always be checked when it is
COLD
.
Never attempt to check it when the oil is hot, or severe injury
could occur.
NEVER CHECK WHEN HOT!
4.
Fill burner fuel tank with diesel.
5.
Check heated hose. The heated hose is an electrical device.
Extreme care must be taken in how it is used and treated. It
must be inspected daily for damage to the outer cover.
6.
Completely read and understand all owner’s manuals before
trying to operate this machine.
Summary of Contents for CRACK PRO 125
Page 1: ......
Page 9: ...9 SAFETY PRECAUTIONS AND CAUTIONS FIRST AID ...
Page 22: ...22 ...
Page 23: ...23 ...
Page 24: ...24 ...
Page 25: ...25 ...
Page 26: ...26 ...
Page 27: ...27 ...
Page 28: ...28 ...
Page 29: ...29 ...
Page 40: ...40 HEATED HOSE MAIN CONNECTOR J1 AND HEATED HOSE J2 ...
Page 62: ...62 CRACK PRO HEATED HOSE MACHINE MACHINE PICTURES AND PARTS LIST ROPER 2 PUMP PUMP DIAGRAM ...
Page 69: ...69 HEATED HOSE MAIN CONNECTOR J1 AND HEATED HOSE J2 TIMES 2 CP 260 DOUBLE PUMPER OPTIONAL ...