67
CRACK PRO® HEATED HOSE MACHINE
OPERATING INSTRUCTIONS – DOUBLE PUMPER
OPTIONAL
THE TEMPERATURE CONTROL
4.
To stop for the day, perform the following steps:
Shut
the agitator control valve.
Put the hose enable/disable switch(s) to the
disable
position.
Turn the pump switch(s) to reverse for 30 seconds, then
turn to the
off
position.
Turn the burner control switch to the
off
position.
Shut off the engine.
AUTOMATIC SAFETY INTERLOCKS:
There are automatic safety interlocks that
control the heated hose, material pump, and agitation systems. The agitator and
pump
will not
work until the material has reached a pre-programmed
temperature on the respective digital controllers. The heated hose must also be
up to temperature before the pump can operate.
Once the 3 controllers reach the programmed temperature settings the
white interlock light comes on,
the agitator control valve will need to be
started manually.
PUMP SWITCH
BURNER CONTROL
SWITCH
HOSE ENABLE/DISABLE
SWITCH
Summary of Contents for CRACK PRO 125
Page 1: ......
Page 9: ...9 SAFETY PRECAUTIONS AND CAUTIONS FIRST AID ...
Page 22: ...22 ...
Page 23: ...23 ...
Page 24: ...24 ...
Page 25: ...25 ...
Page 26: ...26 ...
Page 27: ...27 ...
Page 28: ...28 ...
Page 29: ...29 ...
Page 40: ...40 HEATED HOSE MAIN CONNECTOR J1 AND HEATED HOSE J2 ...
Page 62: ...62 CRACK PRO HEATED HOSE MACHINE MACHINE PICTURES AND PARTS LIST ROPER 2 PUMP PUMP DIAGRAM ...
Page 69: ...69 HEATED HOSE MAIN CONNECTOR J1 AND HEATED HOSE J2 TIMES 2 CP 260 DOUBLE PUMPER OPTIONAL ...