Refer to the section on
Pre-deployment check
on page 5 for details.
4.
Push
Get Current Setup
.
Look at the values stored in the sensor. They show in the Current Setup area.
3.2.1 Adjust operation setup
The examples in this section refer to a sensor that is set up for "Autonomous" operation.
Refer to the section on
External sample control
on page 37 for instructions on how to
set up the sensor for External Sample Control.
1.
View the values in the 'New Setup' Power Consumption area of the software.
1
The number of hours, minutes or seconds that the sensor
actively collects data.
4
The number of days that the sensor will be deployed.
2
The time each "Sample For" in #1 is set to, plus the time
in low-power and warm-up.
5
The volume of the bleach solution that is used for each
injection.
3
The minimum expected temperature in the water where
the sensor is to be deployed.
2.
Adjust the values to see how the Estimated Power Consumption @ 12 V and the Est.
BLIS Remaining are affected.
3.
Adjust these values for the next deployment.
Sensor set up and operation
11