3 Operation
3--20
C9999--2 Issue 1
3.3.3
Adjusting the Reregister Unit
Once the reregister section is adjusted for paper size, no operating adjustment should be necessary except
for dial positioning.
When the basic size of the sheet is changed, then it is necessary to adjust the unit.
Fig. 3-38. Sheet Length
3.3.3.1
Sheet Length
This is the length of the sheet from the binding side
to the edge of the tab.
The position of the delivery conveyor and the
pull--back unit should be adjusted so that the
spring gates are located approximately 1/2” in back
of the back edge (binding edge) of the sheet when
the front edge of the sheet is resting against the
tab cutter back stop in the position where it will be
tabcut. The sheet drive /holddown roller should be
tensioned as necessary using as many as
necessary to control the sheet. Adjust the sheet
catcher on the delivery conveyor so that it will
catch the sheets properly.
SHEET DRIVE /
HOLD--DOWN
ROLLER
REREGISTER
HOLDDOWN
ROLLER
Fig. 3-39. Sheet Width
3.3.3.2
Sheet Width
When the width of the sheet is changed, it may be
necessary to change one or more of the following
items:
1.
Sheet Drive / Hold--Down Rollers: These
should be adjusted so that they hold the sheets
down near the outer edge. They must ride on
the feed tapes.
Summary of Contents for 10,000
Page 2: ...ISSUE NOTE This is Issue 1 Date of Issue August 2004 Copyright 2004...
Page 8: ...1 Introduction Safety 1 1 C9999 2 Issue 1 1 INTRODUCTION SAFETY C9999 2 Issue 1...
Page 9: ...1 Introduction Safety 1 2 C9999 2 Issue 1...
Page 19: ...2 Installation 2 1 C9999 2 Issue 1 2 INSTALLATION C9999 2 Issue 1...
Page 20: ...2 Installation 2 2 C9999 2 Issue 1...
Page 41: ...3 Operation 3 1 C9999 2 Issue 1 3 OPERATION C9999 2 Issue 1...
Page 42: ...3 Operation 3 2 C9999 2 Issue 1...
Page 77: ...3 Operation 3 37 10000 B1 Issue 1 3 4 Handwheel and Tab Set Up...
Page 107: ...3 Operation 3 39 10000 B1 Issue 1 Note Page intentionally left blank...
Page 108: ...4 Maintenance 4 1 C9999 2 Issue 1 4 MAINTENANCE C9999 2 Issue 1...
Page 109: ...4 Maintenance 4 2 C9999 2 Issue 1...
Page 189: ...5 22 5 Scott 10 000 Parts June 2003 Scott 10 000 Parts C 9999 2 Issue 1 5 10 PILE LIFT DRIVE...
Page 215: ...5 48 5 Scott 10 000 Parts June 2003 Scott 10 000 Parts C 9999 2 Issue 1 5 23 BASE DRIVE...
Page 227: ...5 60 5 Scott 10 000 Parts June 2003 Scott 10 000 Parts C 9999 2 Issue 1 5 29 PLASTIC CUT BASE...
Page 231: ...5 64 5 Scott 10 000 Parts June 2003 Scott 10 000 Parts C 9999 2 Issue 1 5 31 TIP DIE UNIT...
Page 249: ...5 82 5 Scott 10 000 Parts June 2003 Scott 10 000 Parts C 9999 2 Issue 1 5 40 CONTROL PANEL...
Page 263: ...5 96 5 Scott 10 000 Parts June 2003 Scott 10 000 Parts C 9999 2 Issue 1 5 47 TAB WIPER UNIT...
Page 273: ...5 106 5 Scott 10 000 Parts June 2003 Scott 10 000 Parts C 9999 2 Issue 1 5 52 TABCUTTER GUARD...
Page 275: ...5 108 5 Scott 10 000 Parts June 2003 Scott 10 000 Parts C 9999 2 Issue 1 5 53 HOLDDOWN UNIT...
Page 277: ...5 110 5 Scott 10 000 Parts June 2003 Scott 10 000 Parts C 9999 2 Issue 1 5 54 REREGISTER DRIVE...
Page 279: ...5 112 5 Scott 10 000 Parts June 2003 Scott 10 000 Parts C 9999 2 Issue 1 5 55 KICK BACK UNIT...
Page 281: ...5 114 5 Scott 10 000 Parts June 2003 Scott 10 000 Parts C 9999 2 Issue 1 5 56 KICK BACK UNIT...
Page 285: ...5 118 5 Scott 10 000 Parts June 2003 Scott 10 000 Parts C 9999 2 Issue 1 5 58 CONVEYOR UNIT...
Page 287: ...5 120 5 Scott 10 000 Parts June 2003 Scott 10 000 Parts C 9999 2 Issue 1 5 59 CONVEYOR UNIT...
Page 289: ...5 122 5 Scott 10 000 Parts June 2003 Scott 10 000 Parts C 9999 2 Issue 1 5 60 PULL BACK UNIT...
Page 291: ...5 124 5 Scott 10 000 Parts June 2003 Scott 10 000 Parts C 9999 2 Issue 1 5 61 PULL BACK UNIT...
Page 303: ...5 136 5 Scott 10 000 Parts June 2003 Scott 10 000 Parts C 9999 2 Issue 1 5 67 INFEED UNIT...
Page 311: ...5 144 5 Scott 10 000 Parts June 2003 Scott 10 000 Parts C 9999 2 Issue 1 5 71 TAB CUTTER...