![SCIEX 3200 QTRAP System User'S Manual Download Page 73](http://html1.mh-extra.com/html/sciex/3200-qtrap/3200-qtrap_system-users-manual_1217527073.webp)
Note:
After replacing the electrode, evaluate the effect of the change on system performance.
This procedure applies to both probes.
1. Remove the electrode adjustment nut and then remove the electrode.
2. Holding the probe with the tip pointing down, so that the spring remains inside the probe,
install a sample fitting in the PEEK union, tightening until it is finger-tight.
Figure 8-2 Probe, Expanded View
Item
Description
1
Electrode adjustment nut
2
1/4 inch retaining nut
3
Spring
4
Retaining ring
5
Sprayer tube
6
Electrode tip
7
Electrode tube
8
PEEK union
3. Pull the PEEK union and the attached electrode tube from the probe.
4. Remove the sample fitting from the PEEK union.
5. Use the 1/4 inch open-ended wrench to remove the retaining nut that holds the electrode
tube in the PEEK union.
6. Remove the electrode tube from the retaining nut.
7. Insert the new electrode tube in the retaining nut and then in the PEEK union.
Service and Maintenance — Ion Source
System User Guide
RUO-IDV-05-6475-C
SCIEX 3200 Systems
73/114