Item
Description
1
To mass spectrometer
2
From column
3
Waste out
Shut Down and Vent the System
Note:
If the input gas supply must be disconnected, then relieve the pressure in the gas lines
before disconnecting it.
Tip!
If the mass spectrometer must be shut down, then follow these instructions.
1. Complete or stop any ongoing scans.
CAUTION: Potential System Damage. Turn off the sample flow before shutting down
the system.
2. Turn off the sample flow to the system.
3. Close the software.
4. Follow these steps to vent the system:
a. Press and hold the
Vent
button for three seconds.
The Vacuum LED begins flashing more quickly than during pump down. The turbo
pump spins down gradually.
5. Turn off the mass spectrometer convenience switch.
6. Disconnect the mass spectrometer mains supply cable from the mains supply outlet.
7. Disconnect the roughing pump mains supply cable from the mains supply outlet.
Operating Instructions
SCIEX 3200 Systems
52/114
System User Guide
RUO-IDV-05-6475-C