
OPERATION
Titan 5000 Series II 01/22
Operation Section 4-34
© 2022 Alamo Group Inc.
OPERA
T
ION
13. TROUBLESHOOTING GUIDE
Problem
Possible Cause
Remedy
Reel does not turn
Oil not getting into hydraulic
Check hydraulic connections
motor.
Check tractor flow control valve
Throwing rocks over back
Reel speed too fast
Adjust flow control on tractor
Reel not sweeping rocks
Batts springs too loose
Tighten springs
into bucket. Excessive
batt tripping
Excessive jerky Reel
compressed coupler insert
Replace coupler insert
motion
Reel coupler not tight on shaft
Tighten reel coupler and lock
Rock thrown over sides
Overfilling bucket
Dump bucket more frequently
and forward
Bucket not filling
Insufficient reel speed
Adjust flow control to tractor
Picking up too much dirt
Poor field conditions
Soil should be firm and dry
Minimum of surface debris
Teeth penetrating too much
Raise grate so teeth just skim
surface
Reel slows significantly when
Open center hydraulic system
Machine must be run on a tractor
the grate is moved
on the tractor.
with a Closed Center Hydraulic System
Summary of Contents for Titan 5000 II Series
Page 4: ......
Page 7: ...Safety Section 1 1 2022 Alamo Group Inc SAFETY SECTION ...
Page 22: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 16 2022 Alamo Group Inc SAFETY ...
Page 23: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 17 2022 Alamo Group Inc SAFETY ...
Page 24: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 18 2022 Alamo Group Inc SAFETY ...
Page 25: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 19 2022 Alamo Group Inc SAFETY ...
Page 26: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 20 2022 Alamo Group Inc SAFETY ...
Page 27: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 21 2022 Alamo Group Inc SAFETY ...
Page 29: ...Introduction Section 2 1 2022 Alamo Group Inc INTRODUCTION SECTION ...
Page 34: ......
Page 35: ...Assembly Section 3 1 2022 Alamo Group Inc ASSEMBLY SECTION ...
Page 49: ...ASSEMBLY Titan 5000 Series II 01 22 Assembly Section 3 15 2022 Alamo Group Inc ASSEMBLY ...
Page 62: ......
Page 63: ...Operation Section 4 1 2022 Alamo Group Inc OPERATION SECTION ...
Page 97: ...Maintenance Section 5 1 2022 Alamo Group Inc MAINTENANCE SECTION ...
Page 106: ......
Page 107: ......
Page 108: ...Titan 5000 Series II 01 22 P N R801 010C Printed Canada ...