
OPERATION
Titan 5000 Series II 01/22
Operation Section 4-31
© 2022 Alamo Group Inc.
OPERA
T
ION
Always install the transport pins before transporting the machine on public roads.
Reduce speed before turning or applying the brakes.
Ensure that both brake pedals are locked together
when operating on public roads.
OPS-U- 0023
This Implement may be wider than the Tractor. Be careful when operating or transporting
this equipment to prevent the Implement from running into or striking sign posts, guard rails,
concrete abutments or other solid objects. Such an impact could cause the Implement and
Tractor to pivot violently resulting in loss of steering control, serious injury, or even death.
Never allow the Implement to contact obstacles.
(S3PT-12)
Allow sufficient clearance for the Implement to swing outward while turning. Implements
carried behind the Tractor will swing outside the tire path when making turns. Contacting a
solid object while turning will cause equipment damage and possible injury.
(S3PT-20)
Be particularly careful when transporting the Implement using the tractor. Turn curves or
go up or down hills only at a low speed and at a gradual steering angle. Make certain that
at least 20% of the tractor’s weight is on the front wheels to maintain safe steerage. Slow
down on rough or uneven surfaces.
(STI-01)
Be particularly careful when transporting the Implement using the tractor. Turn curves or
go up or down hills only at a low speed and at a gradual steering angle. Make certain that
at least 20% of the tractor’s weight is on the front wheels to maintain safe steerage. Slow
down on rough or uneven surfaces.
(STI-01)
Only tow the Implement behind a properly sized and equipped Tractor
which exceeds the weight of the Implement by at least 20%. DO NOT
tow the Implement behind a truck or other type of vehicle. Never tow the
Implement and another Implement connected in tandem. Never tow the
Implement at speeds over 20 MPH.
(STI-06)
Summary of Contents for Titan 5000 II Series
Page 4: ......
Page 7: ...Safety Section 1 1 2022 Alamo Group Inc SAFETY SECTION ...
Page 22: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 16 2022 Alamo Group Inc SAFETY ...
Page 23: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 17 2022 Alamo Group Inc SAFETY ...
Page 24: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 18 2022 Alamo Group Inc SAFETY ...
Page 25: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 19 2022 Alamo Group Inc SAFETY ...
Page 26: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 20 2022 Alamo Group Inc SAFETY ...
Page 27: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 21 2022 Alamo Group Inc SAFETY ...
Page 29: ...Introduction Section 2 1 2022 Alamo Group Inc INTRODUCTION SECTION ...
Page 34: ......
Page 35: ...Assembly Section 3 1 2022 Alamo Group Inc ASSEMBLY SECTION ...
Page 49: ...ASSEMBLY Titan 5000 Series II 01 22 Assembly Section 3 15 2022 Alamo Group Inc ASSEMBLY ...
Page 62: ......
Page 63: ...Operation Section 4 1 2022 Alamo Group Inc OPERATION SECTION ...
Page 97: ...Maintenance Section 5 1 2022 Alamo Group Inc MAINTENANCE SECTION ...
Page 106: ......
Page 107: ......
Page 108: ...Titan 5000 Series II 01 22 P N R801 010C Printed Canada ...