OPERATION
Titan 5000 Series II 01/22
Operation Section 4-33
© 2022 Alamo Group Inc.
OPERA
T
ION
12.2 Hauling the Tractor and Implement
Before transporting a loaded tractor and implement,
measure the height and width dimensions and gross
weight of the complete loaded unit. Ensure that the
load will be in compliance with the legal limits set for
the areas that will be traveled through.
OPS-U- 0024
Use adequately sized and rated trailers and
equipment to transport the tractor and implement.
Consult an authorized dealer to determine the
proper equipment required. Using adequately sized
chains, heavy duty straps, cables and/or binders,
securely tie down both the front and rear of the
tractor utilizing the proper tie down locations as
specified by the tractor manufacturer.
OPS-U- 0025
Arrange the chains so that when tightened, the
chains are pulling downward and against
themselves. Carefully tighten the securing chains or
other fasteners using boomers or binders to apply
maximum tension. Use extreme care when attaching
and removing the securing devices as the extreme
tension involved when released has the potential to
inflict serious injury.
While hauling the tractor and implement, make
occasional stops to check that the tractor and
implement have not moved or shifted and that the
securing chains have maintained tension. If during
transport a hard braking, sharp turning, or swerving
action was performed, stop at the next safe location
to inspect the security of the load.
OPS-U- 0026
Summary of Contents for Titan 5000 II Series
Page 4: ......
Page 7: ...Safety Section 1 1 2022 Alamo Group Inc SAFETY SECTION ...
Page 22: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 16 2022 Alamo Group Inc SAFETY ...
Page 23: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 17 2022 Alamo Group Inc SAFETY ...
Page 24: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 18 2022 Alamo Group Inc SAFETY ...
Page 25: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 19 2022 Alamo Group Inc SAFETY ...
Page 26: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 20 2022 Alamo Group Inc SAFETY ...
Page 27: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 21 2022 Alamo Group Inc SAFETY ...
Page 29: ...Introduction Section 2 1 2022 Alamo Group Inc INTRODUCTION SECTION ...
Page 34: ......
Page 35: ...Assembly Section 3 1 2022 Alamo Group Inc ASSEMBLY SECTION ...
Page 49: ...ASSEMBLY Titan 5000 Series II 01 22 Assembly Section 3 15 2022 Alamo Group Inc ASSEMBLY ...
Page 62: ......
Page 63: ...Operation Section 4 1 2022 Alamo Group Inc OPERATION SECTION ...
Page 97: ...Maintenance Section 5 1 2022 Alamo Group Inc MAINTENANCE SECTION ...
Page 106: ......
Page 107: ......
Page 108: ...Titan 5000 Series II 01 22 P N R801 010C Printed Canada ...