
OPERATION
Titan 5000 Series II 01/22
Operation Section 4-25
© 2022 Alamo Group Inc.
OPERA
T
ION
Use extreme care when transporting the rock picker on public highways and roads. The combination of rock
picker and the tractor is longer in length. The implement is also wider than the tractor. Allow ample clearance
when transporting the tractor and implement to insure that they do not contact any bystanders, signs, road
structures, or other vehicles.
Ensure that all persons are well clear of the rock picker before dumping the bucket. Watch
for low hanging overhead lines.
Do not transport the rock picker at high speeds when it is fully loaded. Take special care
while transporting a loaded rock picker over rough ground.
Stay alert and watch for trees, powerlines, posts, signs, and all other overhead and ground obstructions while
you are rock picking. Use extreme care to avoid hitting these types of obstructions.
9.3 Shutting Down the Implement
To shut down the implement, first bring the tractor to
a complete stop. Then slow down the rock picker by
reducing the engine speed before disengaging the
hydraulics. Wait for all rotating motion to stop
before proceeding to drive or shut down the tractor.
Park the tractor on a level surface, place the
transmission in park or neutral and apply the
parking brake, lower the attached implement to the
ground, shut down the engine, , remove the key,
move all hydraulic lever back and forth to remove
any hydraulic pressure and wait for all motion to
come to a complete stop before exiting the tractor.
Summary of Contents for Titan 5000 II Series
Page 4: ......
Page 7: ...Safety Section 1 1 2022 Alamo Group Inc SAFETY SECTION ...
Page 22: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 16 2022 Alamo Group Inc SAFETY ...
Page 23: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 17 2022 Alamo Group Inc SAFETY ...
Page 24: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 18 2022 Alamo Group Inc SAFETY ...
Page 25: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 19 2022 Alamo Group Inc SAFETY ...
Page 26: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 20 2022 Alamo Group Inc SAFETY ...
Page 27: ...SAFETY Titan 5000 Series II 01 22 Safety Section 1 21 2022 Alamo Group Inc SAFETY ...
Page 29: ...Introduction Section 2 1 2022 Alamo Group Inc INTRODUCTION SECTION ...
Page 34: ......
Page 35: ...Assembly Section 3 1 2022 Alamo Group Inc ASSEMBLY SECTION ...
Page 49: ...ASSEMBLY Titan 5000 Series II 01 22 Assembly Section 3 15 2022 Alamo Group Inc ASSEMBLY ...
Page 62: ......
Page 63: ...Operation Section 4 1 2022 Alamo Group Inc OPERATION SECTION ...
Page 97: ...Maintenance Section 5 1 2022 Alamo Group Inc MAINTENANCE SECTION ...
Page 106: ......
Page 107: ......
Page 108: ...Titan 5000 Series II 01 22 P N R801 010C Printed Canada ...