
INSTALLATION
40 | EN
www.schmalz.com
30.30.01.00226/03
5.6 Pre-assembly of articulated-arm jib
The articulated-arm jib is completely assembled upon delivery so that there is no pre-assembly.
5.7 Pre-assembly of flat jib
1.
Insert the cable trolley (36) with snap hooks and strap (22) for the hose into the pre-assembled
flat jib (34). Quantity according to scope of delivery.
2.
Insert the transport trolley (35) into the flat jib (34).
3.
Place the fixed end stops (14) on the inside and outside of the designated holes on the flat jib
(34).
34
36
14
35
22