![SAVE MARINE H240 Installation Manual Download Page 9](http://html.mh-extra.com/html/save-marine/h240/h240_installation-manual_1203763009.webp)
7
Save Marine, une division de
Save innovations
3 rue des arts et métiers, 38000 Grenoble, France I +33 (0)4 58 00 34 66 I [email protected]
3.8
Port operations
To avoid any impact during port operations, please remove the hydrogenerator from its
home plate prior to accessing the port.
3.9
Anchoring
Do not leave unnecessarily the hydrogenerator into the water while anchoring in order to
prevent fouling. Remove the hydrogenerator from its home plate and store it.
3.10
Maintenance
Rinse with fresh water before storing for a long period.
Check all bolted connections of the hydrogenerator and the home plate on a regular basis.
The product warranty does not cover damages resulting from:
the nonobservance of the “limits and conditions for using” instructions,
difficult sea conditions and/or type of shipping outside the recreational sailing
course,
shocks in collisions with UFOs (unidentified floating objects) or sea creatures.