The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
+1 215.322.6063 P.
+1 215.322.8498 F.
www.sapling-inc.com
12
12
Wiring Information
Buzzer Installation (3300 Series)
W
iri
ng
In
for
m
ati
on
If you ordered a Buzzer with your SBP 3300 clock, it can be installed on the clock circuit board with four easy steps:
1) Attach the long green connector to the J1 Sync Input ports.
2) Confirm that the wires are attached to holes 7 and 8. The red wire should be in hole 7. The black wire should be in hole 8.
3) Attach the short green connector to the J3 Relay Output ports.
4) Confirm that the wires are attached to holes 1 and 2. The yellow wire should be in hole 1. The black wire should be in hole 2.
(
IMPORTANT
: Detach clock from power source before installing new circuitry. DO NOT add new circuitry while the clock is operating)
To program the buzzer, access the clock’s web interface and perform the following actions:
1) Click on the Elapsed Timer tab.
2) FInd the drop-down menu next to “On Countdown complete, close” and select “Relay 2”
3) In “for ____ seconds” set the amount of time that you wish the buzzer to sound when the countdown ends. The number
must be a whole number from 1 to 60.
4) Press the Save button.
J1 - Sync Inputs
9 8 7 6 5 4 3 2 1
J3 - Relay Output
1
2
3
4
*Relay 1 N.O.
*Relay 2 N.O.