SY265C LC/SY265C LR Excavator OMM
SANY
Operation and Maintenance Manual — 0420
5-15
TABL
E OF
CONT
E
N
TS
INTRODUCTION
SAFE
T
Y
MACHIN
E
CONTROLS
MACHINE
OP
ERA
T
IO
N
MA
INTENANCE
SPEC
IFI
CA
TIO
N
S
OP
T
IO
N
A
L
EQUI
PMENT
MAINTENANCE SCHEDULE
Secure the Machine for Maintenance
1. Park the machine on a flat, firm surface.
2. Obtain the Maintenance Log for this machine and complete it at the close of all maintenance procedures.
3. Read and understand all of the procedures to be performed.
4. Prepare the machine for checks and inspections. See “Maintenance Safety” on page 2-8.
5. Allow the machine to cool before performing maintenance.
When Required
•
Check air conditioner fresh-air and recirculation filters. (See page 5-50.)
•
Perform a stationary regeneration. (See page 3-19.)
•
Replace engine primary air filter. (See page 5-34.)
•
Replace hydraulic system breather filter. (See page 5-69.)
•
Check the radiator, oil cooler, charge-air cooler, and the air conditioner condenser fins. (See page 5-46.)
•
Check the track tension. (See page 5-83.)
•
Replace the bucket teeth. (See page 5-111.)
•
Check the windshield washer fluid and windshield wiper. (See page 5-30.)
Daily or Every 10 Hours
•
Lubricate the work equipment. (See page 5-102.)
•
Check the seat belt and buckle. (See page 4-14.)
•
Check decals. (See page 5-109.)
•
Check sheet metal. (See page 5-109.)
•
Check idler wheels. (See page 5-82.)
NOTICE!
Failure to perform the following procedures when and as directed could result in machine
damage and improper machine operation.
Summary of Contents for SY265C LC
Page 2: ...Page Intentionally Blank ...
Page 287: ...Page Intentionally Blank ...