SY265C LC/SY265C LR Excavator OMM
SANY
Operation and Maintenance Manual — 0420
4-45
TA
BLE OF
CO
NTENTS
INTRODUCTION
SA
FE
T
Y
MA
CHINE
CONTROLS
MA
CHINE
OPERA
T
ION
MAINTEN
ANCE
SPECI
FICA
TIONS
OPTIONAL
EQUIP
M
ENT
Trenching Operation
Trenching can be done efficiently by using a suitable bucket
and positioning the tracks parallel to the trench line. When
digging a wider trench, excavate the sides first, then remove
the middle.
Loading Operation
Loading material from the rear of the truck is more
convenient than from the side.
END OF WORKDAY CHECKS
1. Remove all built-up mud or debris on the undercarriage
and machine exterior.
2. Remove all debris from inside the cab to avoid
interference with machine operation.
3. Inspect the machine work equipment, machine exterior,
and undercarriage for signs of fluid leaks or damage.
4. In oceanic (salt-air) environments, thoroughly wash away any salt residue. Apply grease where rust is found,
and perform maintenance on the electrical components to prevent corrosion.
Fig. 4-60
0004375
Fig. 4-61
0004376
Fig. 4-62
0004071
Summary of Contents for SY265C LC
Page 2: ...Page Intentionally Blank ...
Page 287: ...Page Intentionally Blank ...