2.5 Installation of electrical power supply:
1. The machine should be connected the protective-earth terminal between machine and external
ground before connected to the power source.
2. The cross-section of incoming supply protective conductor and each phase conductors must be
in accordance with the following reference of supply conductor table. It is important to identify
the voltage of source with machine. The voltage of connecting source should be marked on the
electric cabinet.
Model
FP120D
FP145D
Recom. Fuse (400V)
25A>fuse>20A
25A>fuse>20A
Supply wire size
5.5mm²
5.5mm²
PE wire size
5.5mm²
5.5mm²
3. During connecting the power supply, always connect the earth conductor with yellow/green
color before the connection of the other power conductor.
4. A terminal for the connection of the external ground conductor is provided in the vicinity of the
associated phase conductor terminal with marked “
PE
”. It should make sure the “
PE
” terminal
being connection before machine operating.
5. Connection should be made to the terminal mark
L1, L2
and
L3
at the connecting seat in the
electrical cabinet. The Veneer Jointing Machine which electric system is equipped with one
main switch, as a safety measure, the door of cabinet can’t be opened unless main switch is
disconnected.
6. On the contrary while disconnecting from the power supply disconnect the earth conductor with
yellow/green color after the all power conductors at disconnected.
7. Always disconnect the power supply from the hand-operated disconnected device mounted on
the door of electrical cabinet, before you intend to do the work of maintenance or inspection.
8. After disconnected the power for maintenance or inspection, be sure to lock the disconnecting
device in “
OFF
” position.
Caution! Power supply has to be installed by a trained technician.