- 17 -
FP120D,FP145D
a) Un tighten or loosened bolt/screw, due to negligence in the assembling line or caused by
the quakes during transportation, might effect unpredictable serious consequence!
Therefore, we strongly suggest that, after initial test running and before commence the
normal production, please check and tighten all the bolts/screws.
Especially, check and tighten those on movable components.
b) Please check and tighten all the bolts/screws every two or there days in the beginning
two weeks.
Check and tighten all the bolt/screw
2.7. Functional tests and Re-testing:
CE Instruction Manual
1.
a) Before test running, Please clean the machine, remove tools, bolt, nut, or any other article
from the conveyor.
b) Open all the cover on this machine, check if everything is in normal.
Cleaning the machine
2.
a) Check wires connected and the power source already connected to the power incoming
terminal.
b) Check the machine already cleaned and without any other article on the machine.
Check the machine very careful before run the machine.
3.
The function of electrical equipment shall be tested per half year normally, particular
emergency push button.
5.
Where a portion of the machine and its associated equiment is changed or modified, that
tests shall be re-verified and retested, such as continuity test of the protective bonding
circuit, insulation resistance tests, voltage tests, protection against residual voltage and
functional tests.
6.
Make sure tue “PE” terminal is properly connected and the machine is grounded before
power connect and push “NO” the main power.
The mechanical parts and electrical parts must be on the position and without loosen.
7.
8.
Check any abnormal noise !
9.
All identified numbers on electrical wires must be correct, check if all wire screws are
properly tightened and no electric happens.
10.
Turn on the main disconnector (NFB: No-fuse Breaker) for the power source to the main
cabinet, check if the voltage is correct, then on the NFB of main control panel and sub
control panel.
11.
The function of safety equipment shall be tested before starting machine.
Emergency stop
——
actuated the push button; the motor power should be shut down.
4.