
2012 LED Factory Test Mode (ES9000)
Main Board Patterns Test
Select:
EchoP Pattern Sel
T-CON Patterns Test
Select:
T-CON Test Pattern
Test Procedure:
1. With TV Power On…
“Mute/147/Mute”
for a
Main
Board
Test Pattern
&
“
Mute/369/Mute”
for a
T-CON
Board
Test Pattern
2. Access
Factory Mode
Standby: Mute,182,power
Power On: Info, Factory
& Select
SVC
3. Select
Test Pattern
4. Select
EchoP Pattern Set
Use the right arrow key to
Scroll through patterns
5. Select
SOC T-CON Test Pattern
or
Echo-FP Post Test Pattern
Use the right arrow key to
scroll through the patterns.
•
If
T-CON
is
OK and
EchoP
(Main Board) is OK the problem is normally the source or input
•
If
T-CON
is OK and
EchoP
(Main Board) is not OK, problem is the LVDS Cable or Main Board.
•
If
T-CON
or
Echo-FP Post Test Pattern
is not OK then the problem is the T-CON Board or PANEL
Summary of Contents for UN75ES9000F
Page 25: ...2 17 2 Product specifications 2 4 2 Hi TV Control Smart Touch Control Viewing the Control ...
Page 77: ...4 8 Cover Middle Rear Dimension 75 inch 4 46 4 Troubleshooting ...
Page 96: ...Fast Track Troubleshooting Manual UN75ES9000FXZA ...
Page 99: ...MoIP Module Troubleshooting 5 ...
Page 106: ...Fast Track Troubleshooting Manual UN75ES9000FXZA ...
Page 109: ...MoIP Module Troubleshooting 5 ...