Proc Sheet 1 08
myZ-5
5HPRYHDQG3ODFH
7KHERDUGPHWDOGRPH
1/1
7RROV
-
Phillips screwdriver
-
Gloves
-
Metal dome fixture of PN NBBSE
SAGEM
-
Plectrum
-
Stick box
3UHOLPLQDU\RSHUDWLRQ
7KLVSURFHGXUHPXVWEHSHUIRUPHGE\DWHFKQLFLDQZLWKJORYHV
1. Remove the battery (
Proc sheet 0 01
).
2. Remove the lower casing of mobile (
Proc sheet 1 01
).
3. Remove the equipped electronic board (
Proc Sheet 1 18
).
5HPRYDOSURFHGXUH
1. Remove the metal dome of the equipped electronic board thanks to the stick box (1).
3ODFHPHQWSURFHGXUH
:DUQLQJ
7KHPHWDOGRPHLVQRWUHXVDEOHLWPXVWEHQHFHVVDULO\UHSODFHGE\DQHZPHWDOGRPH
XQOHVVWKHERDUGLVVZDSSHGDQGVHQWDVOHYHO
1. Replace the new metal dome on the
FOHDQ
equipped electronic board, using the metal dome fixture (2).
)XUWKHURSHUDWLRQV
1. Place the equipped electronic board (
Proc Sheet 1 18
).
2. Place the lower casing of mobile (
Proc sheet 1 01
).
3. Place the battery (
Proc sheet 0 01
).
Stick box
Risk of the procedure :
•
Damage the equipped electronic board.
•
Oxide the equipped electronic board.
Procedure
Symptom
Test
REF MTB DTS 9- Indice B - December 09 2005
Page 5-13