Site technical documentation EC 2005 myZ 5
Test Sheet 03 - BATTERY TEST
4-12
Test Sheet 04 - CONSUMPTION TEST
4-13
Test Sheet 05 - HOTLINE MENU
4-14
Test Sheet 06 - RADIO TEST
4-15
Test Sheet 07 - PHOTO TEST
4-17
CHAPTER 5 - MAINTENANCE PROCEDURES
5-2 SHORT LOOP PROCESS
5-1
5-1 TECHNICAL WORK LEVELS
5-3
5-2 SHORT LOOP PROCESS
5-3
5-3 MAINTENANCE TOOLS
5-3
LEVEL 0 MAINTENANCE
5-5
Proc Sheet 0 01 - Remove and Place the Battery
5-6
LEVEL 1 MAINTENANCE
5-7
Proc Sheet 1 01 - Remove and Place the lower casing of mobile
5-8
Proc Sheet 1 02 - Remove and Place the antenna
5-10
Proc Sheet 1 04 - Remove and Place the keypad of the lower casing of mobile
5-11
Proc Sheet 1 08 - Remove and Place the board metal dome
5-13
Proc Sheet 1 13 - Remove and Place the upper casing of mobile
5-14
Proc Sheet 1 14 - Remove and Palce the battery lock
5-15
Proc Sheet 1 18 - Remove and Place the equipped electronic board
5-16
Proc Sheet 1 20 - Equipped electronic board exchange
5-18
Proc Sheet 1 26 - Remove and Place the lower casing of FLAP
5-21
Proc Sheet 1 27 - Remove and Place the battery rubber
5-23
Proc Sheet 1 29 - Remove and Place the micro rubber
5-24
Proc Sheet 1 30 - Remove and Place the FPC
5-25
Proc Sheet 1 31 - Remove and Place the Keypad of the upper casing of FLAP
5-27
Proc Sheet 1 32 - Remove and Place the upper casing of FLAP
5-29
LEVEL 2 MAINTENANCE
5-30
Proc Sheet 2 01 - Remove and Place the vibrating device
5-31
Proc Sheet 2 02 - Remove and Place the loudspeaker
5-32
REF MTB DTS 9- Indice B - December 09 2005
Page INDEX-3